| |
SCSD#2 Jr High Slope Stabilization – Soldier Pile Wall
The SCSD#2 Jr High Slope Stabilization – Soldier Pile Wall Project is a slope remediation project to repair and stabilize a steep slope between Sheridan Junior High School and Big Goose Creek in Sheridan, Wyoming. The project encompasses 2.14 acres of Sheridan School District #2 property and includes excavation of unstable soils; installation of a soldier pile retaining wall and tieback system; slope grading, site restoration and re-vegetation; new surfacing and sidewalks; and guardrail/ fencing for public protection.
...read more
|
|