| |
Casper College Music Building
The new Casper College Music Building will be completed in the spring of 2013. Portions of two existing parallel parking lots will be demolished in order to make room for construction of the new music building. Surrounding the new ±35,000 square foot, two-story building will be new sidewalk and landscaping, as well as a reconfigured parking lot. A significant elevation change across the site (as much as 5’ between the two existing parallel parking lots) will require unique ways of making up the elevation differences. This will be dealt with through the design and construction of new retaining walls, stairways with railing, and ADA ramps.
|
|