Municipal Infrastructure
<back to portfolio Vista West Engineering  
 
 
 

Powder Horn Concrete 2011

Several areas of the The Powder Horn’s concrete parking lots, sidewalks and cart paths were beginning to cause problems and needed attention.
After evaluating the entire site and determining the problem areas, we were able to divide them into categories based on the method of repair needed. These categories included total replacement, utilizing the Concrete Stabilization Technology (CST), and silicone fill with a sealant.

 

 

 

 
   
Join us on facebook