portfolio
<back to portfolio logo
title=

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Kendrick Park Hill Stabilization

The design of this slope stabilization project located on a hillside in Sheridan, Wyoming included restoration to a dangerous erosional scour, replacement of the storm drainage system that caused the erosion and a 30 foot deep French drain system that intercepts groundwater flows that were destabilizing the hillside.  This project was the 2003 Wyoming Engineering Society Presidential Project of the Year.