| |
Mydland Road Pathway, Phase 2
The City of Sheridan has an extensive pedestrian and bicycle pathway system throughout the City. One of these pathways dead-ended in an area adjacent to Sheridan High School and was an area with heavy pedestrian traffic. The City of Sheridan desired to connect this pathway from Hillpond Drive along Mydland Road behind the high school to connect into West Fifth Street which already had sidewalks. This connection would also provide access to a new development to the south with new portions of pathway also being constructed.
|
|