SAWS 12” Water Main ExtensionThis project involved design and construction observation of 3,630 lineal feet of high pressure water main for the Sheridan Area Water Supply - Joint Powers Board (SAWS-JPB). The pipeline traversed Sheridan County Airport property and included the crossing of a natural wetland. The pipe provided a redundant flow path for the aging transmission main that serves the Little Goose Valley.
|